21/02850/HOU
102 Linden Way London N14 4NH
Single storey front and side extension.
A Flood Risk Assessment (FRA) has not been submitted to demonstrate that the proposal would not result in an increase in flood risk on or off the site within an area identified at risk of surface water flooding, consequently this does not provide a suitable basis for assessment to be made of the flood risks arising from the proposed development. The proposal would be contrary to the advice contained within the NPPF (2021), London Policies SI12 and SI13, Policy CP28 of the Core Strategy and Policies DMD 59, 60, 61 and 62 of the Development Management Document.
The proposal has failed to demonstrate measures to promote and manage sustainable drainage across the site which inhibits the ability of the Local Planning Authority to fully assess whether the proposed development would result in an increase in flood risk on or off the site. The proposal is therefore contrary to the NPPF, London Plan policies SI12 and SI13, Enfield Core Strategy Policies CP21 and CP28 and Enfield Development Management Document Policies DMD59, DMD60, DMD61 and DMD62. Dated: 28 July 2023 Authorised on behalf of: Mr A Higham Head of Development Management Development Management, London Borough Enfield, PO Box 53, Civic Centre, Silver Street, Enfield, Middlesex, EN1 3XE If you have any questions about this decision, please contact the planning officer monika.vistartaite@enfield.gov.uk. List of plans and documents referred to in this Notice: Title/Number Version TYPE Site Location Plan 296_00 Drawing Existing Floor Plans 296_01 Drawing Existing Elevations Drawing Proposed Site Plan Drawing Proposed Elevations Drawing Proposed Floor Plan Drawing Additional Information APPEAL Should you (an applicant or agent) feel aggrieved by the decision of the Council to either refuse permission or to grant permission subject to conditions, you can