253688FUL

Land Rear Of 2 Wood End Lane Northolt UB5 4JL

Full / Other PlanningNortholt Mandeville wardHeathrow Safeguarding Area: All buildings, structures, erect
Submission
29 Sep 2025
Target
16 Dec 2025
Decision
26 Mar 2026
Outcome
Refused
Delegated decisionRefused
26 Mar 2026
Decided by Cheryl Yeung under delegated powers
Loading map…
Scheme description

Construction of a dwellinghouse with roofspace accommodation (following demolition of existing garage)

Why it was refused
Reason 1

The proposal, by reason of its siting, design, appearance and scale would constitute an overdevelopment of a constrained site with a cramped, incongruous and dominant appearance that would be out of keeping with the prevailing pattern of development of the area and harmful to surrounding visual amenity and character along Ribblesdale Avenue. It is therefore contrary to Policies D3 and D4 of the London Plan (2021), Policies 7.4 and 7B of the Ealing Development Management DPD (2013), and Policy DAA of the Ealing Draft Local Plan (Regulation 22).

Reason 2

The proposal, by reason of its siting, scale and design, including location of windows causes unacceptable amenity impact towards no. 2 Wood End Lane in terms of loss of light, loss of outlook, overbearing and overshadowing, and no. 1 Ribblesdale Avenue including loss of privacy and overbearing. It is therefore contrary to Policies D3 and D6 of the London Plan (2021), Policies 7.4 and 7B of the Ealing Development Management DPD (2013), and Policy DAA of the Ealing Draft Local Plan (Regulation 22).

Reason 3

The proposed development, by reason of failing to meet standard of ceiling height, dual aspect and private outdoor amenity space, would constitute a substandard and unsustainable form of development that would provide poor quality living conditions for future residents. The proposal would therefore fail to comply with policy D6 of the London Plan (2021), policy 7B of the Ealing Development Management Development Plan Document (2013), London Housing Design Standards LPG (2023) and the NPPF (2025).

Policies cited
D3
D4
D6
NPPF
Parties
Applicant
Not disclosed
Timeline
29 Sep 2025
Application submitted
21 Oct 2025
Application validated
26 Mar 2026
Delegated decision: Refused
Supporting documents · 13
OFFICERS REPORT26 Mar 2026View ↗
DECISION NOTICE26 Mar 2026View ↗
253688FUL SITE NOTICE MAP SN X 3.PDF21 Oct 2025View ↗
D&A STATEMENT.PDF21 Oct 2025View ↗
NEIGHBOUR SITE NOTICE21 Oct 2025View ↗
APPLICATIONFORMREDACTED29 Sep 2025View ↗
PROPOSED SITE PLAN29 Sep 2025View ↗
SITE LOCATION PLAN29 Sep 2025View ↗
EXISTING PLANS AND ELEVATIONS29 Sep 2025View ↗
EXISTING SITE PLAN29 Sep 2025View ↗
PROPOSED ELEVATIONS 229 Sep 2025View ↗
PROPOSED PLANS29 Sep 2025View ↗
PROPOSED ELEVATIONS29 Sep 2025View ↗
View Application Page ↗
Data from the Ealing planning register.
Summary
Reference
253688FUL
Type
Full Application
Applicant
Not disclosed
Submitted
29 Sep 2025
Decision date
26 Mar 2026
Council
Decision
Refused
Decision route
Delegated (officer)
How long, really
25
wks · this application
Submission → decision · 17 wks over the 8-week target
Public response
Objections
4
In support
0
Total comments
4