Development Intent
AtlasCroydonOfficersHaniel Li
Case officer · Croydon Planning

Haniel Li.

Active — last recorded decision May 2026

A case officer at Croydon with an approval rate of 79% across 236 decided planning applications, spanning 15 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer236 decisions79% approvalSave
Croydon · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
236
Applications
2023–26
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%84%202482%202557%2026
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate79% · 20th of 83
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports31 officer reports parsed
36%
Approves despite concerns
of approvals record a documented reservation
18%
Negotiated approvals
approvals mentioning revisions/amendments
3%
"On balance" reports
reports using explicit balancing language
96%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Croydon's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Croydon reports. Attention, not stance.

Privacy & overlooking
2.58× borough avg
Flooding & drainage
1.97× borough avg
Materials & detailing
1.41× borough avg
Bulk & massing
1.35× borough avg
Outlook & amenity
1.05× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Li's caseload spans HMOs, small infill dwellings and larger residential schemes, and he is distinctive for running detailed unit-by-unit GIA compliance tables with an explicit reasoned uplift calculation where a unit type falls outside the Nationally Described Space Standards (e.g. deriving a bespoke two-storey 1b1p minimum by adding the standard two-storey uplift to the single-storey figure). On unauthorised/retrospective works he cross-checks the as-submitted plans against SITE VISIT observations, explicitly noting where as-built dimensions appear to differ from what was submitted and seeking clarification from the applicant before proceeding.

Observable habits

· where a unit type falls outside the Nationally Described Space Standards' direct categories, derives a bespoke minimum GIA by applying a reasoned analogous uplift calculation (e.g. adding the standard two-storey uplift figure to the single-storey minimum) rather than treating the absence of a direct standard as removing the test

· cross-checks as-submitted retrospective plans against SITE VISIT observations, explicitly noting where as-built dimensions appear to differ from the submission, and seeking applicant clarification before proceeding

· on overlooking from a raised podium/platform near a boundary, calculates the SPECIFIC remaining metres of a neighbour's protected 10m amenity space that would and would not be affected, rather than a blanket overlooking finding

What their reports consistently look for

· a reasoned, analogous uplift calculation deriving a bespoke minimum GIA for a unit type falling outside the direct Nationally Described Space Standards categories

· whether as-built retrospective works, observed during a site visit, match the dimensions shown on the submitted plans, with applicant clarification sought for discrepancies

· the precise number of metres of a neighbour's protected 10m rear amenity space that would be directly overlooked by a raised structure near the boundary

Assigned Haniel Li on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

the minimum requirement for a two-storey 1b1p unit is considered to be 47sqm, derived from the 39sqm requirement for a single-storey 1b1p unit plus an additional 8sqm

25/03845/FUL

the as-built structure appears to be shallower. Clarification was sought from the applicant and agent, but no response has been received.

25/01885/HSE

Measured from 31 published Croydon officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 31 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

DM13Refuse and recycling
2 times cited
T5
2 times cited
T7
2 times cited
DM28Trees
2 times cited
H1
1 times cited
H2
1 times cited
DM10.4
1 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2023–26.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
26/00653/HSE
Householder Application
Refused
2026-05-27
26/00798/HSE
Householder Application
Refused
2026-05-22
26/00653/HSE
Householder Application
Refused
2026-05-27
26/00798/HSE
Householder Application
Refused
2026-05-22
Full application history locked
Subscribe to see all 236 decisions →
Consultants approved most— subscriber data
1. The Harvest Partnership
2. PLANS BY PARK LTD
3. CANOPY PLANNING SERVICES LTD
4. JCDecaux UK Limited
At a glance
OfficerHaniel Li
BoroughCroydon
RolePlanning officer
Experience
Applications236 (2023–26)
Approval rate79%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Croydon planning register and published decision notices, 2023–26. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Croydon decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 31 published Croydon officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.