Development Intent
AtlasBromleyOfficersNeilide Griffin
Case officer · Bromley Planning

Neilide Griffin.

Active — last recorded decision Nov 2024

A case officer at Bromley with an approval rate of 67% across 7 decided planning applications, spanning 7 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer7 decisions67% approvalSave
Bromley · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
7
Applications
2024
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%100%20250%2026
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate67% · 5th of 6
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports140 officer reports parsed
18%
Approves despite concerns
of approvals record a documented reservation
2%
Negotiated approvals
approvals mentioning revisions/amendments
39%
"On balance" reports
reports using explicit balancing language
46%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Bromley's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Bromley reports. Attention, not stance.

Bulk & massing
2.04× borough avg
Materials & detailing
1.95× borough avg
Precedent & consistency
1.51× borough avg
Privacy & overlooking
1.3× borough avg
Outlook & amenity
1.21× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Griffin's refusals (33 of 140) turn heavily on rear-extension depth relative to the host dwelling and its neighbours — she routinely compares the proposed depth against 'other examples of single storey rear extensions in the locality' and will refuse where a scheme 'almost double[s] the depth of the ground floor of the property' even when the design itself, materials and fenestration are separately assessed as acceptable. Where a scheme is granted, she is willing to cite a specific nearby approved precedent by its own reference to support an otherwise borderline judgement on separation distance, the same precedent-citing habit seen across several of this borough's officers but applied here specifically to depth/scale rather than design detailing.

Observable habits

· measures a rear extension's depth against 'other examples...in the locality' as an explicit comparator before reaching a verdict on excessiveness, rather than assessing depth in isolation

· separates the design/appearance test from the amenity-impact test as two distinct paragraphs, and can conclude a scheme is acceptable on materials/fenestration while still refusing on depth/scale alone

· cites a specific comparable granted scheme's own application reference to support a separation-distance judgement on side extensions

What their reports consistently look for

· how a proposed extension's depth compares numerically to other extensions already built or approved nearby, not just whether it exceeds a general policy figure

· whether a design/appearance conclusion and an amenity/scale conclusion are reached independently, so an acceptable design can still be refused on massing alone

· the specific application reference for a comparable approved scheme cited in support of a separation-distance judgement

Assigned Neilide Griffin on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

The extension's depth is significant and notably deeper than other examples of single storey rear extensions in the locality. It will almost double the depth of the ground floor of the property

25/03004/HPA

It has also been noted that a similar scheme has been approved at a nearby property under 22/01854/FULL6 at No.18

25/01985/FULL6

Measured from 140 published Bromley officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 140 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

37General Design of Development
135 times cited
HC1
13 times cited
41Conservation Areas
9 times cited
115Reducing Flood Risk
8 times cited
D3
8 times cited
73Development and Trees
6 times cited
43Trees in Conservation Areas
4 times cited
8Side Space
3 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2024.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
24/01413/FULL1
Full planning permission
Refused
2026-02-20
24/02988/FULL6
Householder planning permission
No determination
2025-11-20
24/01413/FULL1
Full planning permission
Refused
2026-02-20
24/02988/FULL6
Householder planning permission
No determination
2025-11-20
Full application history locked
Subscribe to see all 7 decisions →
Consultants approved most— subscriber data

No named planning consultants on this officer's decided applications.

At a glance
OfficerNeilide Griffin
BoroughBromley
RolePlanning officer
Experience
Applications7 (2024)
Approval rate67%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Bromley planning register and published decision notices, 2024. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Bromley decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 140 published Bromley officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.