Sabrina Mohammed.
Last recorded decision Jul 2022 — no decisions in this record since
A case officer at Brent with an approval rate of 52% across 307 decided planning applications, spanning 16 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.
Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Brent reports. Attention, not stance.
Mark = borough average (1×). Bar capped at 2×.
Mohammed's reports quote Conservation Officer comments directly rather than summarising them, and her Certificate of Lawfulness assessments walk the GPDO question-by-question format methodically, including intermediate 'N/A' answers. Outbuilding cases state the size as a percentage of the host dwelling's own footprint as well as the garden.
· quotes the Conservation Officer’s own written comment verbatim rather than paraphrasing their view
· states outbuilding size both as a percentage of the garden and as a percentage of the original dwelling’s footprint
· walks the full GPDO question set in order for Certificate of Lawfulness cases, including intermediate N/A answers, rather than skipping to the determinative question
· what this officer's reports consistently look for: the Conservation Officer's own comment quoted directly rather than summarised
· what this officer's reports consistently look for: outbuilding size expressed against both the garden area and the original dwelling's own footprint
· what this officer's reports consistently look for: every GPDO question answered in sequence, including the N/A ones, rather than jumping to the determinative test
“Conservation Officer Comments: 'The proposals are acceptable The proposed windows have been designed to replicate the existing windows in design, location and section. They are an improvement on the previous installations and have been designed to embrace the original design by Ernest Trobridge.”
20/0667
“Therefore the outbuilding proposed is 38% of the size of the original dwellinghouse on site.”
20/0768
Measured from 496 published Brent officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.
The policies this officer cites most in their own reports — times cited across 496 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.
Show all 16 rows
Where this officer's caseload concentrates, 2020–22.[1] Click the map above to focus this page on a ward, or a row to open the ward.
- [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Brent planning register and published decision notices, 2020–22. · methodology
- [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
- [3]Condition load — Brent's decision-notice parsing is limited coverage, so no borough or officer figure is shown.
- [4]"How this officer decides", the policy playbook and all quotes — parsed from 496 published Brent officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.