Development Intent
AtlasBexleyOfficersPaulo Tavares
Case officer · Bexley Planning

Paulo Tavares.

Active — last recorded decision May 2026

A case officer at Bexley with an approval rate of 98% across 84 decided planning applications, spanning 10 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer84 decisions98% approvalSave
Bexley · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
84
Applications
2025–26
Approval rate over time — tougher or softer 🔒Dashed line = London average

Not enough dated decisions for a trend yet.

What they decide — by application type
How they compareVersus peers
Approval rate98% · 3rd of 31
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports64 officer reports parsed
27%
Approves despite concerns
of approvals record a documented reservation
0%
Negotiated approvals
approvals mentioning revisions/amendments
0%
"On balance" reports
reports using explicit balancing language
66%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Bexley's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Bexley reports. Attention, not stance.

Bulk & massing
5.01× borough avg
Privacy & overlooking
2.86× borough avg
Materials & detailing
2.85× borough avg
Daylight & sunlight
2.43× borough avg
Outlook & amenity
2.09× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Tavares' caseload is dominated by large-scale Green Belt householder extensions, and he is distinctive for explicitly testing the NPPF paragraph 154(c) 'disproportionate additions over and above the size of the original building' exception, treating the size question as a distinct, named legal test rather than folding it into a general design assessment. He states dimensional findings (width/depth/height to eaves) precisely for each structural element of multi-part extensions in sequence, and is notably attentive to whether new development is 'largely like for like from the perspective of the street scene' when a replacement structure directly substitutes an existing feature (e.g. conservatory replacement), treating substitution differently from net-new additions.

Observable habits

· explicitly tests NPPF paragraph 154(c)'s 'disproportionate additions over and above the size of the original building' Green Belt exception as a named, distinct legal test rather than folding size into general design commentary

· states precise dimensional findings (width/depth/eaves height) for EACH structural element of a multi-part scheme in sequence, building a cumulative massing picture

· distinguishes 'largely like for like' replacement structures (e.g. conservatory-for-extension substitutions) from net-new additions, applying a lighter-touch assessment to genuine substitutions

What their reports consistently look for

· whether a Green Belt extension's cumulative additions are disproportionate to the size of the original building under NPPF paragraph 154(c), tested as a distinct question

· the precise width, depth and eaves height of each individual structural element in a multi-part scheme

· whether a proposed structure is a genuine like-for-like replacement of an existing feature (e.g. a conservatory) rather than a net-new addition, since this affects the level of scrutiny applied

Assigned Paulo Tavares on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

The development does not result in disproportionate additions over and above the size of the original building

25/01802/FUL

Regarding form, mass, bulk and overall scale, the proposal is largely like for like from the perspective of the street scene

25/02605/FUL

Measured from 64 published Bexley officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 64 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

SP1
23 times cited
SP5
23 times cited
DP11
23 times cited
DP33
13 times cited
D1
5 times cited
D4
5 times cited
D5
5 times cited
CG1
4 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2025–26.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
26/00727/FUL
Detailed Planning Application
Approved
2026-06-08
26/00708/FUL
Detailed Planning Application
Approved
2026-06-05
26/00727/FUL
Detailed Planning Application
Approved
2026-06-08
26/00708/FUL
Detailed Planning Application
Approved
2026-06-05
Full application history locked
Subscribe to see all 84 decisions →
Consultants approved most— subscriber data
1. IDEAL Design Ltd
At a glance
OfficerPaulo Tavares
BoroughBexley
RolePlanning officer
Experience
Applications84 (2025–26)
Approval rate98%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Bexley planning register and published decision notices, 2025–26. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — Bexley's decision-notice parsing is limited coverage, so no borough or officer figure is shown.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 64 published Bexley officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.