Development Intent
Planning AtlasBarnetFinchley Church EndApplication
Planning Application

25/0098/FUL

26 The Avenue London N3 2FD

Full / Other PlanningFinchley Church End wardSmoke Control Zone: Multiple
Submission
13 Jan 2025
Target
1 Apr 2025
Decision
29 May 2025
Outcome
Refused
Delegated decisionRefused
29 May 2025
Decided by Edith Leung under delegated powers
Loading map…
Scheme description

Use of the land for the siting of a caravan/mobile home as a residential dwelling following the demolition of existing structure (Amended Description)

Why it was refused
Reason 1

The proposed use of the land for the siting of a caravan/mobile home as a residential dwelling, by reason of its design, materials, siting and use, would fail to respond sensitively to the established building form, pattern of development, scale and massing, to the detriment of the character and appearance of the application site and surrounding area, contrary to Policy D3 of the London Plan (2021), Policy CDH01 of the LB Barnet Local Plan (2025) and the Residential Design Guidance SPD (2016)

Reason 2

In the absence of a car parking survey, refuse/recycling strategy and a legal agreement, insufficient information has been provided to enable the Local Planning Authority to properly assess that the development would not result in a heightened level of parking pressure and congestion, to the detriment of highway and pedestrian safety and the free-flow of traffic, contrary to Policies T4, T6 and T6.1 of the London Plan (2021) and Policy TRC03 of the Local Plan (2025)

Reason 3

In the absence of a Preliminary Ecological Appraisal or Biodiversity Net Gain Assessment and calculation using the Statutory Small Site Metric to demonstrate 10% Net Gain above the baseline of the site, insufficient information has been submitted to determine how the proposed development would protect and enhance biodiversity. As such, insufficient information has been submitted to enable the LPA to properly assess its impact in accordance with its duty under Section 40 of the Natural Environment and Rural Communities Act 2006 or determine an acceptable level of mitigation, and it is considered that the proposed development could cause potential undue harm to wildlife and protected species and fail to secure net biodiversity gain, contrary to Schedule 7a of the Town and Country Planning Act 1990, Policy G6 of the London Plan (2021), Policies ECC07 of the Local Plan (2025).

Reason 4

The proposed development, by virtue of its location and lack of surveillance of the means of access, would fail to provide a safe and secure environment, reduce opportunities for crime and help minimise the fear of crime and insufficient information has been provided, including supporting information, safe accessibility, daily operation requirements, lack of crime prevention measures and existing issues, such as anti-social behaviour, theft and violent offences, to properly assess the impact of the proposal within this specific area, to the detriment of the residential amenities of future occupiers, contrary to Policies D3 and D11 of the London Plan (2021), Policies CDH01 and CHW03 of the LB Barnet Local Plan (2025) and Section 17 of the Crime and Disorder Act (1988)

Policies cited
D3
CDH01
T4
T6
T6.1
TRC03
G6
ECC07
D11
CHW03
Parties
Applicant
Betul Can
Agent
Timeline
13 Jan 2025
Application submitted
4 Feb 2025
Application validated
29 May 2025
Delegated decision: Refused
Supporting documents · 19
DELEGATED REPORT20 Feb 2026View ↗
DN: REFUSE FUL29 May 2025View ↗
29 MANOR VIEW28 Apr 2025View ↗
COMMENT(FULL)1 Mar 2025View ↗
COMMENT(FULL)1 Mar 2025View ↗
COMMENT(FULL)24 Feb 2025View ↗
COMMENT(FULL)21 Feb 2025View ↗
25 MANOR VIEW19 Feb 2025View ↗
COMMENT(FULL)12 Feb 2025View ↗
FLOOR PLAN / ELEVATIONS - DETAILS4 Feb 2025View ↗
APPLICATION FORM4 Feb 2025View ↗
SITE LOCATION PLAN31 Jan 2025View ↗
EXISTING SITE PLAN31 Jan 2025View ↗
EXISTING DRAWING31 Jan 2025View ↗
PROPOSED SITE PLAN / GROUND FLOOR PLAN31 Jan 2025View ↗
SPECIFICATIONS - MOBILE LOG CABIN31 Jan 2025View ↗
PROPOSED STREET SCENE31 Jan 2025View ↗
DESIGN AND ACCESS STATEMENT INCLUDING SUSTAINABILITY AND BNG11 Jan 2025View ↗
COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM11 Jan 2025View ↗
View Application Page ↗
Data from the Barnet planning register.
Summary
Reference
25/0098/FUL
Type
Full Application
Applicant
Betul Can
Submitted
13 Jan 2025
Decision date
29 May 2025
Council
Decision
Refused
Decision route
Delegated (officer)
How long, really
19
wks · this application
Submission → decision · 11 wks over the 8-week target
Public response
Objections
5
In support
1
Total comments
6